*** Notice ***

Due the current construction lockdown restrictions announced by the NSW Government, the proposed road works in Blues St North Sydney (originally to commence on Sunday 18 July 2021) have been postponed until the restrictions are lifted.

Council apologies for any inconvenience caused. If you require further information, please do not hesitate to contact  Council’s Engineering Project Manager.

 

Blue St Pavement Resurfacing (Night Works)

Stateline Asphalt Pty Ltd has been contracted to carry out works for Council. Details are provided below.

  • Street                    Blue St, North Sydney

  • Location                between Miller St and Pacific Hwy (refer overleaf)

  • Start Date              Sunday 18 July 2021

  • Working Hours      9pm to 5am, Monday to Sunday

  • Duration                up to 1.5 weeks (Weather Permitting) 

The work will involve stripping the asphalt layer to expose the underlying concrete base, undertake slab repairs as necessary and then reseal the road full width.

Due to restrictions imposed on Council by the Traffic Management Centre, these works can only be undertaken at night. 

Blue St will be fully closed during the works. Parking in the vicinity of the work site will be unavailable. Residents/Business Owners are requested to move all vehicles from the area indicated by barricades and special work zone signs by 7pm on the above commencement date and no vehicles be parked in this area during the works without the contractor’s permission. Failure to comply with this request will only delay the completion of the works and prolong the loss of parking spaces.

Traffic control will be utilised to safely manage traffic. Alternative bus stops will be provided on the Pacific Hwy.

Pedestrians AND vehicles will be detoured around the work site.

All effort will be made to minimise disruption and complete the works as quickly and safely as possible.  Council appreciates your cooperation and patience.

If you require further information, please do not hesitate to contact Stateline Asphalt on 0416 504 010. Alternatively, you can contact Council’s Engineering Project Manager, Ashraf Doureihi, on 9936 8100 or ashraf.doureihi@northsydney.nsw.gov.au

 