Doohat Ave

EzyPave Pty Ltd has been contracted to carry out works for Council. Details are provided below.

Street             Doohat Av, North Sydney

Location        Between Pacific Hwy and cul-dec-sac (refer below)

Start Date      Tuesday 4 May 2021

 Working Hours Monday-Saturday 9am to 5pm

Duration        up to 4 weeks (Weather Permitting)

The nature of the works includes the restoration of concrete kerb & gutter, footpath, driveways and road pavement – please refer to schematic below.

Parking on Doohat Ave and Bay Road will be limited during the works. Residents are requested to move all vehicles from the area indicated by barricades and special work zone signs by 6am on the above commencement date and no vehicles be parked in this area during the works without the contractor’s permission.

Failure to comply with this request will only delay the completion of the works and prolong the loss of parking spaces.

Traffic control will be utilised to safely manage traffic.

Pedestrians and traffic will be detoured around the work site.

Temporary parking permits will be available from the contractor for residents impacted by the works and who cannot park in their driveway.

All effort will be made to minimise disruption and complete the works as quickly and safely as possible. Council appreciates your cooperation and patience.

If you require further information, please do not hesitate to contact EzyPave on (0450 800603).

Alternatively, you can contact Council’s Engineering Project Manager, Ashraf Doureihi, on 0421 020 129 or ashraf.doureihi@northsydney.nsw.gov.au

 

 

doohat.JPG

Project Location

Back to Listing