Option 2

Proposal: upgrade the existing centre.

Focus: improving experience for current and future users plus increased use as a result of additional facilities.

Aquatics: replace 50m pool with new 50m pool and create new family leisure pool, ensuring that they meet the new safety and usability standards, including a full shade cover over the family leisure pool. Upgrade the existing change facilities. Upgrade the existing 25m pool to 8 lanes. Enlarge the indoor pool hall. New cafe facility.

Health and wellness: construct new gym in the grandstand above the change room.

Grandstand: full refurbishment with a new shade structure roof. Capacity: 1700.

Retain harbourside wall, grandstand and stair tower.

Parking no additional car parking.

Capital cost $28 million (preliminary estimate).

Related Documents

NSOP_Opt06_bridge.jpg

 

NSOP_Opt06_pool.jpg

Related Links

Related Documents