Approved out of hours works

Go back to web version

Print version

Current out of hours works

View current out of hours works approved by Council

The following works are scheduled to take place outside of approved construction hours.

Council only approves work outside approved construction hours in specific circumstances. Examples include overnight shop fit-outs or where demolition, excavation or erection of structures may be a risk to public safety during daylight hours.

Approved hours of work

The approved hours of work for a specific development site are contained in the Development Consent.

You can view the Development Consent for each site via our application tracker.

Application tracker

Please note, we are not the only authority who can approve out of hours works. There may be additional approved works we are not aware of (for emergencies, water works etc).

Navagiting this page

View current works by clicking next below or clicking the links in the box at the top of the page.

Grasmere Reserve Playground Upgrade, Cremorne

Works: works include removal of the existing playground, refurbishment of some existing playground equipment, removal of some furniture/fixtures, followed by installation of new playground, sandstone logs, concrete paths, picnic settings, plants, turf, mulch, and other miscellaneous works.

Works dates: Works will take place from Monday 22 September for 5 weeks, between 7am and 5am Monday to Friday and 8am to 1pm Saturday, weather permitting

Contact: Aaron Crocombe, GJ’s Landscape and Civil, 0402 180 777.

Letter to residents

Wilson Street Road Reserve

Works:embankment stabilisation works

Work dates: Works will commence Monday 13 October and will be completed within a week and a half, 7am to 5pm Monday to Friday and 7am to 2pm Saturday, weather permitting 

Contact: Shamrock Developments International, 0430 592 240

Letter to residents

Willoughby Road, Crows Nest

Works: Stormwater diversion - Ground breaking, excavation, saw cutting, laying concrete pipes, backfilling

Works dates: Works will take place from Monday 20 October to Wednesday 22 October and Monday 27 October to Wednesday 29 October, Monday 3 November to Wednesday 5 November between 9pm and 5am, weather permitting (Noise works such as ground breaking, excavation, saw cutting, before midnight)

Contact: Jack Unwin, Growthbuilt, j.unwin@growthbuilt.com.au 

Palmer Street, Cammeray

Works: embankment stabilisation works

Work dates: Works will commence Monday 20 October and will be completed within 3 days, 7am to 5pm Monday to Friday, weather permitting 

Contact: Shamrock Developments International, 0430 592 240

Brett Whiteley Place, North Sydney

Works: Anti-slip treatment

Work dates: Works will commence at 7pm Saturday, 1 November and will be completed by 10am on Sunday 2 November, weather permitting 

Contact: Edward Wong, North Sydney Council’s Manager Footpaths, Roads and Drainage, 9936 8100 or edward.wong@northsydney.nsw.gov.au

McLaren Street, North Sydney

Works: Mobile crane used for Telecom upgrade

Work dates: Works will take place on Saturday 22 November from 7am to 5pm, weather permitting 

Contact: Amy Dowsett, Site Security & Traffic Control,  info@sstc.net.au 

Walker Street, North Sydney

Works: Crane to lift roof units

Work dates: Works will take place on Saturday 06 December 8pm to 5am, weather permitting 

Contact: Katie Flaherty, Borger Traffic, katie@borgertraffic.co

Young Street Plaza Upgrade

Works: construction of stormwater drainage infrastructure including pits, lintels, kerb and gutter and stormwater pipping

Work dates: Works will commence Monday 10 November and will be completed within 5 days, 7pm to 5am Monday to Wednesday and 9pm to 5am Thursday to Friday, weather permitting 

Contact: Ali Makouk, EzyPave, 0450 090 759

Letter to residents 

Yeo Street, Cremorne

Works: Finishing works to 3rd floor concrete slab, including trowelling and surface finishing. All concrete pouring and deliveries must be completed prior to 5pm

Work dates: Works will commence at 5pm Thursday, 13 November and will be completed by 11pm, weather permitting 

Contact: Tony Elias, 02 9006 1000, tony@pierceproperty.com.au

Walker Street, North Sydney

Works: Excavation Works Connecting to Ausgrid Assets

Work dates: Works will take place on Monday 10, Tuesday 11 and Wednesday 12 November 2025 and Monday 17, Tuesday 18 and Wednsday 19 November 8pm to 5am, from 8pm to 5am, weather permitting

 

Willoughby Road, Crows Nest

Works: Stormwater Diversion Works Chandos Street, Crows Nest between Willoughby Road and Ingram Lane

Work dates: Works will take place as listed below, weather permitting:

  • Monday 24 November 8pm to 5am
  • Tuesday 25 November 8pm to 5am
  • Wednesday 26 November 8pm to 5am
  • Thursday 27 November 8pm to 5am
  • Monday 1 December 8pm to 5am
  • Tuesday 2 December 8pm to 5am
  • Wednesday 3 December 8pm to 5am
  • Thursday 4 December 8pm to 5am

Contact: Charlie Sukkar, Growthbuilt, 0477 443 433 or Peter Tanusovski, Chrisos Civil, 0405 186 110

Works by other authorities

Third parties, such as utility companies and state departments, do not have to notify Council of emergency works.

For more details on out of hours works being carried out in your area, check with the following organisations: