Print version
Current out of hours works
View current out of hours works approved by Council
The following works are scheduled to take place outside of approved construction hours.
Council only approves work outside approved construction hours in specific circumstances. Examples include overnight shop fit-outs or where demolition, excavation or erection of structures may be a risk to public safety during daylight hours.
Approved hours of work
The approved hours of work for a specific development site are contained in the Development Consent.
You can view the Development Consent for each site via our application tracker.
Please note, we are not the only authority who can approve out of hours works. There may be additional approved works we are not aware of (for emergencies, water works etc).
Navagiting this page
View current works by clicking next below or clicking the links in the box at the top of the page.
Grasmere Reserve Playground Upgrade, Cremorne
Works: works include removal of the existing playground, refurbishment of some existing playground equipment, removal of some furniture/fixtures, followed by installation of new playground, sandstone logs, concrete paths, picnic settings, plants, turf, mulch, and other miscellaneous works.
Works dates: Works will take place from Monday 22 September for 5 weeks, between 7am and 5am Monday to Friday and 8am to 1pm Saturday, weather permitting
Contact: Aaron Crocombe, GJ’s Landscape and Civil, 0402 180 777.
Wilson Street Road Reserve
Works:embankment stabilisation works
Work dates: Works will commence Monday 13 October and will be completed within a week and a half, 7am to 5pm Monday to Friday and 7am to 2pm Saturday, weather permitting
Contact: Shamrock Developments International, 0430 592 240
Willoughby Road, Crows Nest
Works: Stormwater diversion - Ground breaking, excavation, saw cutting, laying concrete pipes, backfilling
Works dates: Works will take place from Monday 20 October to Wednesday 22 October and Monday 27 October to Wednesday 29 October, Monday 3 November to Wednesday 5 November between 9pm and 5am, weather permitting (Noise works such as ground breaking, excavation, saw cutting, before midnight)
Contact: Jack Unwin, Growthbuilt, j.unwin@growthbuilt.com.au
Palmer Street, Cammeray
Works: embankment stabilisation works
Work dates: Works will commence Monday 20 October and will be completed within 3 days, 7am to 5pm Monday to Friday, weather permitting
Contact: Shamrock Developments International, 0430 592 240
Brett Whiteley Place, North Sydney
Works: Anti-slip treatment
Work dates: Works will commence at 7pm Saturday, 1 November and will be completed by 10am on Sunday 2 November, weather permitting
Contact: Edward Wong, North Sydney Council’s Manager Footpaths, Roads and Drainage, 9936 8100 or edward.wong@northsydney.nsw.gov.au
McLaren Street, North Sydney
Works: Mobile crane used for Telecom upgrade
Work dates: Works will take place on Saturday 22 November from 7am to 5pm, weather permitting
Contact: Amy Dowsett, Site Security & Traffic Control, info@sstc.net.au
Walker Street, North Sydney
Works: Crane to lift roof units
Work dates: Works will take place on Saturday 06 December 8pm to 5am, weather permitting
Contact: Katie Flaherty, Borger Traffic, katie@borgertraffic.co
Young Street Plaza Upgrade
Works: construction of stormwater drainage infrastructure including pits, lintels, kerb and gutter and stormwater pipping
Work dates: Works will commence Monday 10 November and will be completed within 5 days, 7pm to 5am Monday to Wednesday and 9pm to 5am Thursday to Friday, weather permitting
Contact: Ali Makouk, EzyPave, 0450 090 759
Yeo Street, Cremorne
Works: Finishing works to 3rd floor concrete slab, including trowelling and surface finishing. All concrete pouring and deliveries must be completed prior to 5pm
Work dates: Works will commence at 5pm Thursday, 13 November and will be completed by 11pm, weather permitting
Contact: Tony Elias, 02 9006 1000, tony@pierceproperty.com.au
Walker Street, North Sydney
Works: Excavation Works Connecting to Ausgrid Assets
Work dates: Works will take place on Monday 10, Tuesday 11 and Wednesday 12 November 2025 and Monday 17, Tuesday 18 and Wednsday 19 November 8pm to 5am, from 8pm to 5am, weather permitting
Willoughby Road, Crows Nest
Works: Stormwater Diversion Works Chandos Street, Crows Nest between Willoughby Road and Ingram Lane
Work dates: Works will take place as listed below, weather permitting:
- Monday 24 November 8pm to 5am
- Tuesday 25 November 8pm to 5am
- Wednesday 26 November 8pm to 5am
- Thursday 27 November 8pm to 5am
- Monday 1 December 8pm to 5am
- Tuesday 2 December 8pm to 5am
- Wednesday 3 December 8pm to 5am
- Thursday 4 December 8pm to 5am
Contact: Charlie Sukkar, Growthbuilt, 0477 443 433 or Peter Tanusovski, Chrisos Civil, 0405 186 110
Works by other authorities
Third parties, such as utility companies and state departments, do not have to notify Council of emergency works.
For more details on out of hours works being carried out in your area, check with the following organisations:
-
Transport for NSW (TfNSW) - live traffic updates covering multiples agencies
-
TfNSW - Western Harbour Tunnel
-
Ausgrid works
-
Sydney Water works
-
NBN works
-
Sydney Metro - Victoria Cross Station (North Sydney) updates
-
Sydney Metro - Crows Nest Station updates
-
Sydney Metro - Blues Point temporary tunnel access site, located at Henry Lawson Reserve, McMahons Point.